Reference eCRF Creation Validation Training: This articles describes the steps required for the creation and validation of a new REDCap project on the Brain-CODE Instance of REDCap. REDCap projects can be designed and amended by a
Project Initiation
...
Project Creation Process
Study Initiation:
...
The Ontario Brain Institute reviews and approves the initiation of a new study.
The new study is added to the Brain-CODE Study Metadata Repository (MDR).
REDCap Project Creation:
An Indoc IDP Lead creates the study project on REDCap
...
Import: Standard forms for Participant Informed Consent, CDEs, etc. are imported by an IDP PM or IDP user with Designer permissions.
...
Design: Additional electronic Case Report Forms (eCRFs) are created, modified, and tested thoroughly by the IDP.
...
by copying a template Brain-CODE project which contains all Common Data Elements (CDEs).
The Indoc IDP lead ensures the Subject Enrolment and Informed Consent form and all of the CDE electronic Case Report Forms (eCRFs) that will be collected by the study are included in the project and up-to-date.
The Indoc IDP Lead grants access to the project to the Designated Project Designer.
REDCap Project Design:
Additional eCRFs that will be collected as part of the study are manually created or imported by the Designated Project Designer.
Study arms, events, event designations, and other customizations are configured by the Designated Project Designer in the Project Settings page to match the study protocol.
The Designated Project Designer tests all forms and features of the REDCap project to ensure they adhere to the study protocol and are working as expected. Additional users can be added to test the project, provided no real participant data is entered, while the project is still in development
REDCap Project Submitted for Review:
A request to have the project
...
...
Production is submitted by the Designated Project Designer.
The Designated Project Designer sends the study protocol, original Case Report Forms (CRFs) and all relevant Informed Consent Forms to the
...
Indoc IDP Lead and OBI Data Quality Team.
Project Validation (6-8 weeks)
Creation Validation:
Indoc IDP Lead validates the project to ensure
...
case report form best practises are met using the Validation Checklist
...
and creates a Validation Report which lists all flagged issues and suggested fixes.
...
Indoc IDP Lead sends the Validation Report to the
...
Designated Project Designer.
IDP Review and Amendments:
The Designated Project Designer reviews the Validation Report, updates the project to correct
...
Approval: Steps 6-7 are repeated until all standards are met, whereby the IDP Lead will approve the project status change to production.
...
Production: Once in production, coordinators or data entry persons can be granted access to the project and participant data can be entered.
...
any issues flagged during validation, and documents the rationale for any rejected suggestions.
The Designated Project Designer thoroughly tests any changes made to the project.
The Designated Project Designer sends the Validation Report back to the Indoc IDP Lead with details on changes and/or rationale for each flagged issue.
Amendment Validation:
Steps 1-2 are repeated until the Indoc IDP Lead has confirmed that all standards have been met.
Once validation is complete, the Indoc IDP Lead updates the Brain-CODE Study MDR to mark the project as validated.
Push to Production:
The Indoc IDP Lead updates the study status in Brain-CODE Study MDR and enables federation of the data to the Brain-CODE Federation System.
The Indoc IDP Lead deletes all test records from the project.
Once in Production, participant data is permitted to be entered and access to the project can be requested for coordinators.
Project Amendment Validation
Any changes that need to be made to a project that is in Production must be reviewed and approved by an Indoc IDP Lead.
Info |
---|
If the need arises for minor amendments, the Designated Project Designer can put the project into Draft mode and |
...
make changes without affecting the integrity of the live database. |
...
IDP Request 2: When changes are complete, the IDP PM or Designer requests that the changes be moved into production.
...
Validation 2: Indoc IDP Lead validates the project changes to ensure the data integrity standards are met and creates an Amendment Report. This step may involve the creation of a Test Version of the REDCap project where the changes are applied and testing outside of the production environment.
...
IDP Review 2: Indoc IDP Lead sends the Amendment Report to the IDP PM or Designer who reviews the project to correct warnings, apply applicable suggestions, and do any additional testing in the Test Version of the REDCap project.
...
Approval 2: Steps 12-13 are repeated until all standards are met, whereby the IDP Lead will approve the project changes.
...
Steps 10-14 are repeated whenever any modifications need to be made to the REDCap project.
If complex changes, or major amendments, are planned for the project and/or new eCRFs need to be added, a copy of the REDCap project that does not contain production-level participant data can be created by the Indoc IDP Lead where access can be granted to the Designated Project Designer to design and test project changes. |
REDCap Project Amendment:
For minor amendments, the Designated Project Designer puts the project into Draft mode in the online designer and makes their changes to the project.
For major amendments, the Designated Project Designer requests a copy of the REDCap project that does not contain participant data, from the Indoc IDP Lead, and implements their changes in the test project.
Amendments Submitted for Validation: When changes are complete and have been thoroughly tested, the Designated Project Designer can submit the amendments for review by emailing the following information to the Indoc IDP Lead:
The Project ID of the project that requires validation.
A list of the changes made to the project and their rationale.
Documentation of REB Approval for any changes that would affect the Study Protocol.
Original versions of any new eCRFs to be added.
Amendment Validation:
The Indoc IDP Lead validates the project changes to ensure case report form best practises are met and amendments will not cause any existing data to be altered, orphaned, or lost.
The Indoc IDP Lead sends an Amendment Report to the Designated Project Designer.
IDP Review and Amendments:
The Designated Project Designer reviews the Amendment Report, updates the project to correct any issues flagged, and documents the rationale for any rejected suggestions.
The Designated Project Designer thoroughly tests any changes they made to the project.
The Designated Project Designer sends the Amendment Report back to the Indoc IDP Lead with details on changes/rationale for flagged issues.
Amendment Validation:
Steps 1-2 are repeated until the Indoc IDP Lead has confirmed that all standards have been met.
Push to Production:
The Indoc IDP Lead approves the changes in REDCap. Once approved, the project amendments will be visible to data entry users and on survey pages sent to participants in the production project.
\uD83D\uDCCB Related articles
Filter by label (Content by label) | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|